{"product_id":"consultant-role-in-construction-projects-electrical-installations-successful-electrical-installations-in-construction-projects-needs-experienced-co-paperback","title":"Consultant Role in Construction Projects - Electrical Installations: Successful Electrical Installations in Construction Projects Needs Experienced Co - Paperback","description":"\u003cdiv\u003e\u003cp style=\"text-align: right;\"\u003e\u003ca href=\"https:\/\/reportcopyrightinfringement.com\/\" target=\"_blank\" rel=\"nofollow\"\u003e\u003cb\u003eReport copyright infringement\u003c\/b\u003e\u003c\/a\u003e\u003c\/p\u003e\u003c\/div\u003e\u003cp\u003eby \u003cb\u003eHani Alkhayyat\u003c\/b\u003e (Author), \u003cb\u003eNidhal Nabulsi\u003c\/b\u003e (Contribution by)\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eAbout the Book -\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003eThis book is the resulted from a combined experienced for the authors in their work in construction field in UAE for nearly 30 years doing practical construction of electrical systems in Contracting consulting and project management companies.\u003c\/p\u003e\u003cp\u003eThe variety of projects done include: \u003c\/p\u003e\u003cp\u003eDental and health care centers, Housing communities. VVIP Palaces. Transportation project (Metro and Rail). And Hotels.\u003c\/p\u003e\u003cp\u003eThe book was prepared to provide practical information about site work and tabulated based on the installation of the electrical systems. The subjects were provided completely in each chapter or section that doesn't need to jump from chapter to another.\u003c\/p\u003e\u003cp\u003eThe Authors can assure that this book will provide at least 5 years of experience if read properly and understood correctly.\u003c\/p\u003e\u003cp\u003eThe authors will be grateful for any feedback whether positive or negative that will enable raising the quality of the book and the contents for next revisions.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eAbout the Authors -\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eNedal Shawkat Nabulsi\u003c\/strong\u003e Electrical Engineer holding B.Sc. in Electrical Engineering- University of Baghdad -1981.\u003c\/p\u003e\u003cp\u003eWork in UAE: \u003c\/p\u003e\u003cp\u003eAL Anwar Electrical company.\u003c\/p\u003e\u003cp\u003eJumma Al Majid Company.\u003c\/p\u003e\u003cp\u003eCentral Bank-Sharjah Branch. (Maintenance Engineer).\u003c\/p\u003e\u003cp\u003eKhatib and Alami (28 years)\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eHani AlKhayyat\u003c\/strong\u003e Electrical Engineer holding B.Sc. in Electrical Engineering- University of Mosul - 1985.\u003c\/p\u003e\u003cp\u003eProjects in UAE: \u003c\/p\u003e\u003cp\u003eFNCT 2000-2001(Contractor): Health care center \u0026amp; dental clinic center in Fujairah Hospital\u003c\/p\u003e\u003cp\u003eEMI-Electromechanics 2002-2003 (Contractor): Design Engineer\u003c\/p\u003e\u003cp\u003eThermo. 2003-3005 (Contractor): Uptown Mirdif\u003c\/p\u003e\u003cp\u003eHill International 2005-2009 (PMC): Petroleum Institute -Abu Dhabi \u0026amp; Sama Tower-Dubai\u003c\/p\u003e\u003cp\u003eParsons 2009-2022 (Consultant): Dubai Metro -Green Line\u003c\/p\u003e\u003cp\u003eWSP 2012-2013 (Consultant): Presidential Palace in Abu Dhabi\u003c\/p\u003e\u003cp\u003eAECOM 2013-2016 (PMC): Etihad rail\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003eNumber of Pages:\u003c\/strong\u003e 326\u003c\/div\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003eDimensions:\u003c\/strong\u003e 0.89 x 11 x 8.5 IN\u003c\/div\u003e\n            \u003cdiv\u003e\n\u003cstrong\u003ePublication Date:\u003c\/strong\u003e September 10, 2024\u003c\/div\u003e\n            ","brand":"BooksCloud","offers":[{"title":"Default Title","offer_id":53522403164467,"sku":"9789360067366","price":66.04,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0300\/5595\/6612\/files\/uky-_vB9hz9789360067366.webp?v=1781971638","url":"https:\/\/www.vysn.com\/products\/consultant-role-in-construction-projects-electrical-installations-successful-electrical-installations-in-construction-projects-needs-experienced-co-paperback","provider":"VYSN","version":"1.0","type":"link"}